Industrial
Fuya Battery Factory Kuching
- Project Status
- Completed
- Location
- Kuching
The Fuya Energy Industrial Facility integrates manufacturing, administration and supporting operations within a cohesive industrial complex. A long-span steel production hall provides a spacious and flexible environment for machinery, material movement and changing operational requirements. Continuous windows and translucent roof panels introduce natural daylight, while wide overhangs and canopies provide protection from the tropical climate. Grey profiled metal cladding is animated by bold orange accents, giving the large industrial building a distinctive identity. An adjoining multi-storey administrative block establishes a formal corporate frontage, completing a development that balances operational efficiency, adaptability and architectural character.
Phase 1 – Completed (2022) – RM 60mil
Phase 2 – Under Construction (2023) – RM 11mil
Phase 3 – Design Development (2025)